Home / Facility & Infrastructure

Facility & Infrastructure

Manufacturing Details

A 30,800 sq. m. facility engineered for reliable, traceable ferrous casting production — from moulding and melting to finishing — backed by full power redundancy and ERP-driven process control.

  • Installed Production Capacity 12,000 MT per annum
  • Total Land Area 30,800 square metres
  • Area Under Shed Approx. 10,000 square metres
  • Power Backup 420 KVA & 250 KVA diesel generators for uninterrupted operations
  • Material Handling Sufficient cranes for movement of castings, mould boxes and tooling
  • IT Infrastructure The entire process is recorded and driven by an ERP system for complete end-to-end traceability and control
  • Training Dedicated in-house training facility for continual workforce improvement
Bhuwalka Castings factory exterior and yardMachine shop with heavy machining equipmentSilent power diesel generator backupFoundry floor with moulding lines and cranes

Head Office

No. 5, Walker Lane (On Langford Road) Richmond Town, Bangalore,Karnataka , IndiaPin – 560025
bcfl@bhuwalka.co.in

Our Factory

Tamka Industrial Area,Plot No : 17,18,19 & 20,Kolar, Karnataka, IndiaPin – 563101

Copyright - 2024. © Bhuwalka Castings & Forging Pvt Ltd. All rights reserved.